Prefabrication has begun for tank No. 7 at the Fujian LNG receiving terminal, where Jingjiang Daming is processing 9 percent nickel cryogenic steel plate supplied by Tisco. The two firms met on site once the first batch of plates passed incoming inspection, aligning drawings, welding procedures and the U-groove bevel required for the tank wall sections. Prefabrication accuracy at this stage sets the dimensional tolerance for the tank’s inner shell.
This is an editorial summary written by Xinray Technology. All rights to the original report belong to China Iron and Steel Association Stainless Steel Branch.
Reactors, Tanks & Process Vessels
Xinray Technology fabricates stainless steel and glass-lined reactors, jacketed and mixing vessels and storage tanks for chemical, pharmaceutical and food processing plants.