PERC Water Wins $39.8 Million Contract for Central Coast Blue Purification Plant

Water Treatment & Environment 2026-10-12 Source: Consolidated Water Co. Ltd. (SEC filing)

Consolidated Water’s US subsidiary PERC Water has been awarded a design-build agreement worth approximately US$39.8 million by the City of Pismo Beach, California, for the Central Coast Blue Advanced Water Purification Facility. The plant, located in Grover Beach, will apply ultrafiltration, three-stage reverse osmosis and ultraviolet advanced oxidation to treat municipal wastewater and produce about 925,000 cubic metres of purified water a year. The treated water will be injected into the Santa Maria groundwater basin in an indirect potable reuse scheme, with physical construction expected to begin in spring 2027.

Read the full story at Consolidated Water Co. Ltd. (SEC filing) →

This is an editorial summary written by Xinray Technology. All rights to the original report belong to Consolidated Water Co. Ltd. (SEC filing).

Water Treatment Equipment

Xinray Technology designs and builds reverse osmosis, ultrafiltration, EDI and softening systems — from packaged process-water skids to containerised seawater desalination plants.

More Industry News

Looking for equipment for your line?

Tell us your process — we will reply with a tailored proposal.

Contact Us
Scroll to Top