Lantania Aguas has renamed itself NMDC Lantania Water, completing the integration that followed NMDC Infra’s purchase of a 51% stake, with Lantania Group retaining 49%. The Seville-headquartered company, which has opened a permanent Abu Dhabi office, carries a project backlog above EUR 450 million including the 273,000 m3/day Fujairah and 300,000 m3/day Ras Mohaisen reverse osmosis plants, and says more than 580,000 m3/day of desalination capacity is under construction.
This is an editorial summary written by Xinray Technology. All rights to the original report belong to Lantania.
Water Treatment Equipment
Xinray Technology designs and builds reverse osmosis, ultrafiltration, EDI and softening systems — from packaged process-water skids to containerised seawater desalination plants.